Digital snag list
Photo-first, timestamped, per-unit defect tracking. Each snag is routed to the right contractor; every fix is verified by the resident.
Three workflows define a good handover day: the snag list that holds up in a warranty dispute, the first board election that satisfies the law, and the document package that survives the transfer. Yuniyo delivers all three as a single flow.
Handover is not a bundle of loose features — it’s a coherent platform with each of these pieces designed to work with the next.

Every defect, document, election, and signed handover package leaves a clear record that the board can keep using after the developer exits.
Photo-first, timestamped, per-unit defect tracking. Each snag is routed to the right contractor; every fix is verified by the resident.
Candidate nominations, quorum-aware voting, and auto-generated minutes. Election rules are configured for the statutory framework of each market we operate in.
Lease, warranties, technical drawings, maintenance manuals — the full package delivered digitally, searchable, and signed off.
Every appliance, every system, every contractor — logged with expiry and a one-tap way for residents to file claims years later.
A structured flow for every unit: access, utilities, inventory, snag walk-through, keys issued. Nothing forgotten.
Internet, utility transfer, parking allocation, amenity passes — all arranged before the boxes arrive.
Two weeks before keys, residents do a structured site walk and raise initial snags. The contractor fixes them before handover day.
Each unit goes through the checklist: access granted, utilities live, inventory signed off, keys issued. All on tablets, all timestamped.
In the first 30 days, residents nominate, canvass, and vote for the board / management committee. Minutes auto-filed.
The pre-handover community space transfers to the new board with one click. Developer keeps a read-only archive.
If yours isn’t here, we’re on email and usually reply within a day.
We implement local apartment-association voting to the letter of the law — quorum, decision categories, minutes, separate director-board votes where required. Each market gets its own statutory module: Estonia first, then the rest of the EU as we expand, and state-level RWA rules in India.
From snag list to signed minutes — one structured flow, zero spreadsheets.